search.ch
Construction work: WinterthurConstruction work: Winterthur

01/18/2020 04:00 - 11/30/2020 02:59

In Winterthur station, engineering work is in progress.

S-Bahn trains S11 are cancelled between Zürich HB and Seuzach/ Sennhof- Kyburg.
Please switch to existing connections

The S3 service continues to run as S11 service from Zürich HB to Zürich Hardbrücke - Dietikon (- Aarau).

The online timetable is adapted.
For further information, please call Rail Service at 0848 44 66 88 (CHF 0.08/Min. from the Swiss fixed-line network).

Message SBB

22:46 – 00:12 1h 26'

  1. S-TrainS-Train S12 (heading for Brugg AG) exiting at Baden (Duration: 86') S12

22:46 – 00:12 1h 26'

  1. S-TrainS-Train S12 (heading for Brugg AG) exiting at Baden (Duration: 86') S12

22:47 – 23:51 1h 04'

  1. InterCity 4 (heading for Zürich HB) up to terminal station (Duration: 36') IC 4
  2. Zürich HB
  3. InterRegio 36 (heading for Basel SBB) exiting at Baden (Duration: 15') IR 36

22:47 – 23:51 1h 04'

  1. InterCity 4 (heading for Zürich HB) up to terminal station (Duration: 36') IC 4
  2. Zürich HB
  3. InterRegio 36 (heading for Basel SBB) exiting at Baden (Duration: 15') IR 36

22:57 – 00:21 1h 24'

  1. S-TrainS-Train S9 (heading for Uster) exiting at Zürich HB (Duration: 56') S9
  2. Zürich HB
  3. InterRegio 16 (heading for Brugg AG) exiting at Baden (Duration: 15') IR 16

22:57 – 00:21 1h 24'

  1. S-TrainS-Train S9 (heading for Uster) exiting at Zürich HB (Duration: 56') S9
  2. Zürich HB
  3. InterRegio 16 (heading for Brugg AG) exiting at Baden (Duration: 15') IR 16
Monday 02/17/2020

04:57 – 06:21 1h 24'

  1. S-TrainS-Train S9 (heading for Uster) exiting at Zürich HB (Duration: 56') S9
  2. Zürich HB
  3. InterRegio 16 (heading for Bern) exiting at Baden (Duration: 15') IR 16

04:57 – 06:21 1h 24'

  1. S-TrainS-Train S9 (heading for Uster) exiting at Zürich HB (Duration: 56') S9
  2. Zürich HB
  3. InterRegio 16 (heading for Bern) exiting at Baden (Duration: 15') IR 16

Legend

  • Reservation possible
  • OM
    Mouth and nose coverage mandatory